Decision-Making Framework for Evaluating Outsourcing Strategies in Industrial Projects

Authors

    Seyed Mohammad Amin Javid * Ph.D. Candidate, Department of Management, Faculty of Economics and Administrative Sciences, Ferdowsi University of Mashhad, Mashhad, Iran m.amin.javid@gmail.com

Keywords:

Outsourcing Strategy, Industrial Projects, Decision-Making Framework, Organizational Readiness, Performance Management, Thematic Analysis, Stakeholder Engagement

Abstract

The objective of this study was to develop a context-sensitive decision-making framework for evaluating outsourcing strategies in industrial projects, based on insights from industry professionals. This qualitative study employed a thematic approach to explore how outsourcing decisions are made within industrial project environments. Data were collected through in-depth, semi-structured interviews with 21 professionals involved in project management, procurement, and strategic planning in Tehran-based industrial companies. Participants were selected through purposive sampling, and interviews continued until theoretical saturation was reached. The interview transcripts were analyzed using NVivo software through an inductive thematic analysis process to extract key themes and patterns. The analysis revealed four major thematic categories influencing outsourcing decisions: (1) Strategic Evaluation Criteria (e.g., cost-benefit analysis, risk assessment, competitive positioning), (2) Organizational Readiness and Internal Capabilities (e.g., technological infrastructure, process maturity, decision-making structures), (3) Stakeholder Involvement and Communication (e.g., intra-organizational coordination, relationship management, risk communication), and (4) Post-Outsourcing Performance Management (e.g., KPI tracking, SLAs, knowledge retention). Participants emphasized the importance of aligning outsourcing strategies with business goals, ensuring internal capacity for integration, and maintaining relational continuity through performance monitoring and feedback loops. The study provides an empirically grounded framework for evaluating outsourcing strategies in industrial projects, highlighting the necessity of a systemic and multidimensional approach. The results suggest that effective outsourcing decisions depend not only on economic and operational logic but also on organizational maturity, stakeholder alignment, and adaptive performance management. These insights offer both theoretical advancement and practical guidance for organizations seeking to implement outsourcing strategically within complex industrial settings.

Downloads

Download data is not yet available.

References

Alpago, H. (2022). The Importance of Outsourcing in the Production Process in the Globalizing World. İmgelem, 6(11), 539-550. https://doi.org/10.53791/imgelem.1120505

Alrawabdeh, W., Alshurideh, M. T., AlHamad, A., & Kurdi, B. A. (2023). Explicating the Mediating Role of Outsourcing Strategy: Operations Management Practices Affecting Capacity Expansion Decision. International Journal of Theory of Organization and Practice (Ijtop), 3(1), 127-142. https://doi.org/10.54489/ijtop.v3i1.242

Cui, W., Ye, J., Lin, Y., Qian, S., Liu, Y., Yang, H. F., & Li, Y. J. (2011). Japan Software Project Risk Management. Advanced Materials Research, 267, 175-178. https://doi.org/10.4028/www.scientific.net/amr.267.175

Faraji, A., Rashidi, M., & Sorooshnia, E. (2020). An Integrated Organizational System for Project Source Selection in the Major Iranian Construction Companies. Buildings, 10(12), 251. https://doi.org/10.3390/buildings10120251

Hassan, M. G., Adegoke, O., & Razalli, M. R. (2015). Practices Project Management Strategies in Outsourcing Best Practices. Jurnal Teknologi, 77(5). https://doi.org/10.11113/jt.v77.6113

Hee, W. J., Jalleh, G., Lai, H.-C., & Lin, C. (2020). E-Commerce and IT Projects. 454-480. https://doi.org/10.4018/978-1-7998-2451-0.ch023

Khidzir, N. Z., Mohamed, A., & Arshad, N. H. (2014). Evaluation of Vulnerability Risk Factor: Critical ICT Outsourcing Project Characteristics. 1-5. https://doi.org/10.1109/wict.2014.7076901

Lai, J., Fu, Y., Chen, Y., & Du, B. (2022). Interactions Among Antecedents Of project Outsourcing Strategies: Evidence From Chinese Construction Firms. Engineering Construction & Architectural Management, 30(10), 5196-5216. https://doi.org/10.1108/ecam-01-2022-0047

Lin, C., Jalleh, G., & Huang, Y. A. (2016). Evaluating and Managing Electronic Commerce and Outsourcing Projects in Hospitals. 132-172. https://doi.org/10.4018/978-1-4666-9870-3.ch005

M’Mbihi, D. A. (2015). Evaluation of Project Outsourcing Risks on Project Performance in Selected Companies in the Telecommunication Sector in Kenya. strategicjournals.com, 2(1). https://doi.org/10.61426/sjbcm.v2i1.113

Macharia, R. (2017). Influence of Logistics Outsourcing on Project Performance in the Oil and Gas Industry in Kenya. strategicjournals.com, 4(2). https://doi.org/10.61426/sjbcm.v4i2.434

Sandhu, M., Shamsuzzoha, A., & Helo, P. (2018). Does Outsourcing Always Work? A Critical Evaluation for Project Business Success. Benchmarking an International Journal, 25(7), 2198-2215. https://doi.org/10.1108/bij-06-2017-0146

Santa, R., Victoria, O. E. R., & Tegethoff, T. (2023). The Role of Quality in the Hotel Sector: The Interplay Between Strategy, Innovation And outsourcing to Achieve Performance. The TQM Journal, 37(1), 199-221. https://doi.org/10.1108/tqm-01-2023-0016

Skochylias, R. V., & Skochylias, N. V. (2024). Analysis of the Relationship Between Supply Chain Management and Outsourcing Strategies in Freight Transportation. The Actual Problems of Regional Economy Development, 1(20), 144-163. https://doi.org/10.15330/apred.1.20.144-163

Wee, H. M., Peng, S.-Y., & Wee, P. (2009). Modelling of Outsourcing Decisions in Global Supply Chains. An Empirical Study on Supplier Management Performance With Different Outsourcing Strategies. International Journal of Production Research, 48(7), 2081-2094. https://doi.org/10.1080/00207540802644852

Xiu, L., & Ali, D. A. (2025). Understanding the "Gap" Phenomenon in Outsourced Development Projects, Including the Dimensions of the Gap: A Research Study. Journal of Neonatal Surgery, 14(12S), 450-455. https://doi.org/10.52783/jns.v14.3245

Yao, Y. (2015). Studies on Outsourcing Industry Development in the City of Tongxiang. https://doi.org/10.2991/meici-15.2015.50

Yun, L., Zuo, X., & Hou, Y. (2009). Study on the Risk Management of IT Project Outsourcing in Bank. 717-720. https://doi.org/10.1109/ieec.2009.156

Yunitarini, R. (2021). Kerangka Konsep Penentuan Outsourcing Produksi Dengan Dukungan Intelligence Decision Support System. SN.SD, 1(01), 75-82. https://doi.org/10.33005/senada.v1i01.22

Zakharchenko, V., Kovalyk, O., & Paryniuk, I. (2024). Organization of Outsourcing Activity at Ukrainian Enterprises. Economics Finances Law, 2/2024(-), 6-8. https://doi.org/10.37634/efp.2024.2.1

Zhang, M., Pawar, K. S., Shah, J., & Mehta, P. (2013). Evaluating Outsourcing Partners' Capability: A Case Study From the Pharmaceutical Supply Chain. Journal of Manufacturing Technology Management, 24(8), 1080-1101. https://doi.org/10.1108/jmtm-02-2012-0023

Zhang, R., Fu, Y., Chen, Y., Du, B., & Ma, D. (2025). Configurations for High Outsourcing Performance in Construction Projects: An Integrated Perspective of Transaction Costs and Capabilities. International Journal of Managing Projects in Business, 18(1), 209-240. https://doi.org/10.1108/ijmpb-07-2024-0163

Downloads

Published

2025-09-01

Submitted

2025-06-18

Revised

2025-08-21

Accepted

2025-08-25

How to Cite

Javid, S. M. A. (2025). Decision-Making Framework for Evaluating Outsourcing Strategies in Industrial Projects. Digital Transformation and Administration Innovation, 3(3), 1-9. https://journaldtai.com/index.php/jdtai/article/view/164

Similar Articles

1-10 of 102

You may also start an advanced similarity search for this article.